• Construct new infiltration basin stabilized with screened loam and erosion control matting
  • Install basin overflow catch basin, outlet pipe and headwall to wetland discharge location
  • Install main entrance catch basin and outlet pipe to wetland discharge location
  • Install new drainage improvements while maintaining access to operating facility
  • Remove, regrade and replace asphalt pavement in multiple locations