• 1.5 miles of road
  • 13 fire hydrants
  • 2 span precast bridge
  • 3 oil / water separators
  • 38 catch basins
  • 4,500 linear feet of drain
  • 40 sewer manholes
  • 45 drain manholes
  • 45,000 cubic yards of ledge blasted and processed on site
  • 6 detention ponds
  • 6,000 linear feet of water main
  • 7,000 linear feet of sewer main
  • 91 wooded lot subdivision
  • Prep 91 house lots